The plan document
Each persisted plan is one document in the plan store (yggdrasil_plans on CouchDB, or the dev SQLite file). The fields that govern execution:
| Field | Meaning |
|---|---|
status |
Approval only: "draft" or "approved". Never changed by executing the plan |
run_token |
The latest execution request. Raise it to request another run |
executed_run_token |
The latest request that was finished. Starts at -1 |
plan_generation |
Opaque ID of this planned version. Kept by approval and token changes, replaced when the plan is regenerated |
execution_authority / execution_owner |
Who may execute the plan: "daemon", or one "run_once" session |
plan.failure_policy |
"fail_fast" or "continue_independent" (see Failure policies) |
last_finalized_execution |
The result of the latest finished request: execution_id, plan_generation, run_token, failure_policy, outcome, termination_reason, finalized_at, and the full attempt report |
A plan is eligible to run when status == "approved" and run_token > executed_run_token. The caller must also hold its execution authority: the daemon runs "daemon" plans, and a run-doc --run-once session runs only the plans it created.
When a plan becomes eligible, the executing process reads the plan document afresh. The plan, its policy, generation, run token and authority all come from that one read, never from the change event that prompted it. Within one process, a plan has at most one attempt in flight. A request that arrives while it runs is checked again once that attempt is done.
Approval status is not an execution outcome
status says only whether a plan may run. It stays "approved" after a run, however the run went. The outcome of a finished request is recorded in last_finalized_execution.outcome, which is "succeeded" or "failed".
The plan summary's last_finalized_outcome reflects last_finalized_execution. The ops snapshot reflects something else: the newest observed attempt, which may be newer than the last finalized request, or not finalized at all. For example, if request 0 succeeds and request 1 then fails under fail_fast, the snapshot shows request 1's failure, while last_finalized_execution still records request 0's success. To relate the two, compare their execution_id, plan_generation and run_token.
executed_run_token == run_token means the latest request is finished, not that it succeeded. A continue_independent plan finishes its request even when steps failed, so it can have equal tokens and a failed outcome. To tell whether the latest request succeeded, check all three:
executed_run_token == run_token
last_finalized_execution.run_token == run_token
last_finalized_execution.outcome == "succeeded"
Which endings finish a request
Every attempt closes a report when it ends, but only some endings finish the request, recording its result and its token together:
| How the attempt ended | fail_fast |
continue_independent |
|---|---|---|
| Every step succeeded or was reused | Finished, succeeded |
Finished, succeeded |
| Every step that could run ran, with some failed or blocked | Not possible: the attempt stops at the first failure | Finished, failed |
A step failed and the attempt stopped (failed_fast) |
Not finished: stays eligible | Not possible |
| Rejected by preflight: invalid graph, step IDs that cannot name a work directory of their own, malformed output declarations, or a step reference that is malformed or names a missing module or function | Not finished: stays eligible | Finished, failed: rerunning an unchanged plan cannot help |
| Cancelled (daemon shutdown, Ctrl+C) before every step had run | Not finished: stays eligible | Not finished: stays eligible |
| Aborted by an infrastructure failure, such as the event spool being unwritable, or a step module that exists but fails to import | Not finished: stays eligible | Not finished: stays eligible |
A plan whose failure_policy is unknown is rejected by preflight too, but belongs to neither column: it is not a valid continue_independent request, so its request stays eligible, like a rejected fail_fast one.
A request that is not finished stays eligible. Nothing retries it on a timer: the daemon runs it again the next time it observes a change to the plan document. A fail_fast plan therefore keeps its established behavior: after a failure, it runs again on its next change.
A continue_independent plan whose request finished with failures does not run again by itself, and approving it again changes nothing. It needs a new request.
Once an attempt has run every step it could, its result is recorded even if the caller then shuts down. Stopping the daemon at that point does not throw the finished result away.
The log line that resolves each request follows the same distinction. A finished request that succeeded is logged at INFO. A continue_independent request that ran every step it could and finished failed is logged at WARNING: its failures are recorded truthfully, and nothing malfunctioned. A finished preflight rejection, an unfinished request, and a result that could not be recorded are logged at ERROR. The step failures themselves are logged where they happen.
Requesting a rerun
To run a plan again, raise run_token by one and leave status as "approved". This is the only way to rerun a finished continue_independent request, and it works for any plan. Write the change conditionally on the document's revision (_rev), as an approval actor does: if the plan changed since it was read, reread it and decide again. On the dev SQLite backend, the write must also advance the plan-change sequence in the same transaction, or PlanWatcher never observes it (see Manual plan approval in Configuration).
The new attempt runs in the same work directories as the previous one:
- A step whose earlier success is still valid is reused (
step.skipped): its fingerprint is unchanged and its declared outputs exist. - A step that failed runs again. So does a step that was blocked, once its prerequisites succeed. If they fail again, it is blocked again.
- To force a successful step to run again, remove its
success.fingerprintfrom<work_root>/<plan_id>/<step_id>/, or one of its declared outputs.
Regenerating the plan, when a realm handler saves a new version of it, starts a new plan_generation with its tokens reset. That new version is a new request, and it runs as such. A result still in flight from the old version is never recorded onto the new one.
When a result cannot be recorded
A finished request is recorded by a conditional write that commits the outcome and the executed token together. It refuses to overwrite a newer generation, a newer result or a changed authority. A write that loses a race or hits a transient storage error is tried again, up to three tries in all, 0.5 s and then 1 s apart. Those retries only record the result. A failed step is never retried.
If the result still cannot be recorded, after three failed tries or one non-retryable storage error, it is kept in memory as a pending finalization. What that looks like:
- The log reports
Plan '<plan_id>' execution '<execution_id>' ... finished, but its result could not be recorded; keeping it pending, and not executing the plan again until it is recorded or superseded. - The ops snapshot shows the attempt as
finished, but the plan document still has the previousexecuted_run_token, and nolast_finalized_executionfor thatrun_token. run-doc --run-onceexits with code 1.- Other plans keep running.
While the result is pending, this process does not execute the plan again, and further change events for it retry nothing. To recover once the plan store is healthy again, raise run_token. The process then tries once more to record the pending result, with the same bounded tries, and runs the new request only once the old result is recorded or definitively refused. If recording fails again, the new request waits too: raise run_token again to try again. Each newer run_token buys one round of tries. A pending result is also dropped, without anything being written, when the plan is regenerated, its authority changes, or its result turns out to have been recorded after all.
A pending result lives only in memory. If the process restarts, it is lost, and the old request is still eligible, so it may run again. Realm steps must therefore tolerate running again over their own earlier work.
If recording is refused for good, because the plan was regenerated, deleted or reassigned while it ran, the result is dropped (superseded). Run-once exits with code 1.
Operational snapshots (plan_status)
The ops consumer reads the event spool periodically in daemon mode, and once when run-doc --run-once exits. It writes one plan_status snapshot per plan to the operations store (yggdrasil_ops on CouchDB, or the dev SQLite file).
A snapshot is the execution status of one attempt: the latest observed attempt, finished or not. An attempt is observed once it has published its start record or its report. Among those, the one whose execution ID orders highest is shown, which is normally the most recently started one; replaying an old attempt's events cannot change the choice. An attempt whose directory is still empty, because it was cancelled or killed between reserving its ID and publishing its start record, is never shown. How far the ordering can be relied on, across restarts, clocks and concurrent processes, is described in Execution IDs and attempt order. Every step is shown as that attempt left it. A step never takes an earlier attempt's state.
An attempt shows as running until its report is published. An attempt that ended without publishing one, because event publication failed or the process was killed, keeps showing as running until a newer attempt is observed. It did not finish its request, so the plan document does not record it. See Attempt reports.
| Field | Content |
|---|---|
type, realm, plan_id, scope, updated_at |
Identity of the plan and time of the snapshot |
projection |
"attempt", or "legacy" for a plan with no observed attempt, whose spool holds only events published before attempts were correlated. A legacy projection shows each step's latest run, which need not belong to one attempt |
attempt |
The attempt shown: execution_id, the plan_generation and run_token it captured, failure_policy, execution_authority, execution_owner, started_at, and state ("running" or "finished"). Once finished: ended_at, termination_reason, outcome, is_drained, counts per outcome plus unreached (every step without an outcome, interrupted ones included), and any attempt-level diagnostic, such as a preflight rejection. null for a legacy projection |
steps |
One entry per planned step, keyed by step ID: step_name, state, outcome, run_id, fingerprint, progress, artifacts, metrics, job, ts, error for a failed step, and direct_blockers and failed_ancestors for a blocked one |
A step's state is the event type that records its outcome: step.succeeded, step.skipped (reused), step.failed or step.blocked. While it runs, it is its latest lifecycle event. A step with no outcome is pending while the attempt runs. Once the attempt has ended, it is interrupted if it had started and unreached if it never did.
The snapshot's plan_generation is the one the attempt captured. It is not necessarily the stored plan's current generation, which only the plan document holds.
Resetting the event spool
Snapshots are read from the attempt directories described in Event spool layout. Event files in the earlier layout, such as <plan_id>/<execution_id>_plan_attempt_started.json beside the plan's step directories, are not read, and they neither affect new attempts nor block them. To start from a clean spool, stop Yggdrasil first, then delete the spool's contents or point YGG_EVENT_SPOOL at a new directory. Nothing else needs resetting, and Yggdrasil deletes nothing itself:
- Plan documents, run tokens, work directories, artifacts and cache markers are unaffected. Clearing events does not request a rerun, and does not make a finished request run again.
- A plan's stored
plan_statussnapshot stays as it was until new events are consumed for that plan. Deleting a plan's event directory does not remove its snapshot. - Deleting attempt directories erases what orders new attempts after a restart; see the limits in Execution IDs and attempt order.
See also
- Flow API — scheduling, failure policies, declared outputs and events
- CLI —
run-doc --run-onceexit codes - Troubleshooting — plans that do not run, or do not run again